Author: Volunteer Park Trust (Volunteer Park Trust)

Newsletter – April 2019
Post

Newsletter – April 2019

Spring has arrived with abundant blooms in Volunteer Park. Read the latest on our upcoming Spring Restoration Day, our new sponsor, and GiveBIG in our April newsletter!

The Amphitheater
Project

The Amphitheater

We're raising funds to replace the current amphitheater with a new, covered stage in order to expand the use of this outdoor performance space in a one-of-a-kind park setting.

Work begins on water tower
Post

Work begins on water tower

Seattle Public Utilities (SPU) has begun work on the Volunteer Park Water Tower to reduce minor flooding on nearby pedestrian pathways. They are upgrading the drainage systems, stormwater grates and piping system, and assure us that they will take precautions to protect all tree roots. During this time, the Water Tower will remain open but...

Halloween pet parade a huge success
Post

Halloween pet parade a huge success

Volunteer Park was packed last month with crowds of people and their costumed pets attending our first annual Halloween Pet Parade. This October extravaganza featured over 20 vendor booths, food trucks (for both people and pets!), and over 100 entries into our pet costume competition. Participants showed off their creativity, skills, and humor while vying...

Olmsted path restoration underway
Post

Olmsted path restoration underway

Walking on the east side of Volunteer Park, you may have noticed a lot of construction behind the Seattle Asian Art Museum (SAAM). As part of SAAM’s renovation, two historic Olmsted pathways (lost decades ago due to neglect) will be restored. Volunteer Park Trust joined with Friends of Seattle’s Olmsted Parks to have these important...

Lily Pond Railings
Project

Lily Pond Railings

Volunteer Park Trust replaced the wire fencing around the North and South Lily Ponds with safe, permanent, beautifully designed metal rails.