In an effort to standardize the design of garbage and recycling cans and reduce the number of plastic cans, VPT funded the installation of new, metal cans throughout the park in Spring 2023.
Project Category: Featured
Project
Irrigation Project & Replanting of the Lily Ponds
Volunteer Park Trust replaced the wire fencing around the North and South Lily Ponds with safe, permanent, beautifully designed metal rails.
Project
Resurfacing walking paths
Crews began working to resurface the North-South walking path parallel to 15th Ave E. in Spring 2024.
Project
Museum forecourt water fountain
A new ADA-accessible water fountain, with a pet bowl, will be installed on the north side of the SAAM forecourt in late summer 2023.
Project
Replacing the Amphitheater
We're raising funds to replace the current amphitheater with a new, covered stage in order to expand the use of this outdoor performance space in a one-of-a-kind park setting.